Algebra 2 · Grades 10, 11

Work-Rate Problems: Jobs Done Together

Quick answer

If a painter finishes a room in 6 hours, she paints 1/6 of it each hour. Work rates, not times, add when people or machines work together: 1/6 + 1/3 = 1/2 of the job per hour, so together they need 2 hours. A drain working against a pipe subtracts its rate. Setting the combined rate equal to 1 over the total time gives a rational equation, and solving it finds the time together or a missing worker's time.

What you'll learn

  • Turn a time for a whole job into a rate
  • Add rates to find the time to finish together
  • Find a missing worker's time from the combined time
  • Handle rates that work against each other

Rates add, times do not

Ana paints a room in 66 hours and Ben in 33. Working together, how long do they take? Not 99 hours, and not 4.54.5. Think in rates: Ana does 16\tfrac{1}{6} of the room per hour and Ben 13\tfrac{1}{3}. Together they do

16+13=12 of the room per hour\frac{1}{6} + \frac{1}{3} = \frac{1}{2} \text{ of the room per hour}

so they finish in 22 hours. In general, with separate times aa and bb and time together TT,

1a+1b=1T\frac{1}{a} + \frac{1}{b} = \frac{1}{T}

which is a rational equation.

Why the combined time is less than either

Each worker alone would finish the job; together they share it, so each has less to do. The combined rate is bigger than either rate alone, and a bigger rate means a shorter time. That gives a quick check: the time together must be less than the faster worker’s time. A drain or a leak works the other way, so its rate is subtracted.

Fraction of the room painted over time Three lines showing the fraction of the room painted against hours, from 0 to 6. Ana alone, at 1/6 per hour, reaches 1 at 6 hours. Ben alone, at 1/3 per hour, reaches 1 at 3 hours. Together, at 1/2 per hour, they reach 1 at 2 hours. 1234561tjob
  • Ana alone
  • Ben alone
  • together
  • whole job
Fraction of the room painted over time

Worked examples

Common mistakes

Practice problems

  1. One printer takes 1010 minutes for a job and a second printer takes 1515. How many minutes do they take together?

    Answer

    66

    Full solution

    110+115=16\tfrac{1}{10} + \tfrac{1}{15} = \tfrac{1}{6}.

  2. Three machines finish a job alone in 22, 33 and 66 hours. How many hours do they take together?

    Answer

    11

    Full solution

    12+13+16=1\tfrac{1}{2} + \tfrac{1}{3} + \tfrac{1}{6} = 1 job per hour.

  3. Two people together mow a lawn in 33 hours. One alone takes 55 hours. How many hours does the other take alone?

    Answer

    7.57.5

    Full solution

    1x=13−15=215\tfrac{1}{x} = \tfrac{1}{3} - \tfrac{1}{5} = \tfrac{2}{15}.

  4. A hose fills a pool in 55 hours, but a leak would empty it in 2020. How many hours does the pool take to fill?

    Answer

    203\tfrac{20}{3}

    Full solution

    15−120=320\tfrac{1}{5} - \tfrac{1}{20} = \tfrac{3}{20} per hour, so 203≈6.67\tfrac{20}{3} \approx 6.67 hours.

  5. Using T=aba+bT = \tfrac{ab}{a + b}, how many hours do workers taking 44 and 1212 hours need together?

    Answer

    33

    Full solution

    4816=3\tfrac{48}{16} = 3.

  6. Ana paints for 22 hours alone (at 66 hours per room), then Ben joins (at 33 hours per room). How many more hours to finish?

    Answer

    43\tfrac{4}{3}

    Full solution

    Ana does 26=13\tfrac{2}{6} = \tfrac{1}{3} alone, leaving 23\tfrac{2}{3} at 12\tfrac{1}{2} per hour: 2/31/2=43\tfrac{2/3}{1/2} = \tfrac{4}{3} hours.

  7. Two identical pumps together drain a tank in 55 hours. How many hours does one pump take alone?

    Answer

    1010

    Full solution

    2x=15\tfrac{2}{x} = \tfrac{1}{5}.

  8. A student says Ana and Ben take 4.54.5 hours together, the average of 66 and 33. What went wrong?

    Answer

    Times cannot be averaged; adding rates gives 22 hours.

    Full solution

    Working together is faster than the faster worker alone, so the answer must be under 33 hours.

Frequently asked questions

How do work-rate problems work?

Convert each time into a rate: finishing a job in t hours means 1/t of the job per hour. Rates of workers working together add.

What is the formula for two workers?

1/a + 1/b = 1/T, where a and b are their separate times and T their time together. So T = ab/(a + b).

Why don't the times add?

Adding times would mean working one after the other. Working at once shares the job, so the combined time is less than either time alone.

How do I handle a drain or a leak?

Subtract its rate. A pipe filling in 4 hours and a drain emptying in 6 give 1/4 − 1/6 = 1/12 per hour.

How do I check the answer?

The time together must be less than the faster worker's time alone. For 6 and 3 hours, the answer 2 hours passes.

Standards alignment

This lesson covers the following Common Core State Standards for Mathematics.

  • CCSS.MATH.CONTENT.HSA.REI.A.2Reasoning with Equations and InequalitiesSolve simple rational and radical equations in one variable, and give examples showing how extraneous solutions may arise.
  • CCSS.MATH.CONTENT.HSA.CED.A.1Creating EquationsCreate equations and inequalities in one variable and use them to solve problems. Include equations arising from linear and quadratic functions, and simple rational and exponential functions.